Video gallery
AlphabeticallyBy date
Gazprom put into operation modernized hydropower unit No. 2 of the Verkhne-Tulomskaya HPP in the Murmansk Region. As a result of the works performed, the installed electric capacity of the HPP rose by 32 MW and reached 300 MW.
Verkhne-Tulomskaya HPP
Svobodny Thermal Power Plant comes onstream in Amur Region
Main Equipment of Pancevo CCPP Delivered to the Construction Site
![](http://img.youtube.com/vi/_fsQUV6t6j8/mqdefault.jpg)
Second power unit of Grozny TPP comes onstream
Gazprom starts building thermal power plant in Serbia
Video presentation of Gazprom Energoholding — 2018
![](http://img.youtube.com/vi/epPUTbZzO1c/mqdefault.jpg)
Video presentation of Gazprom Energoholding