Background color
Show images
Font size
Letter spacing
Line spacing
Gazprom put into operation modernized hydropower unit No. 2 of the Verkhne-Tulomskaya HPP in the Murmansk Region. As a result of the works performed, the installed electric capacity of the HPP rose by 32 MW and reached 300 MW.